Royal United Hospital Bath NHS Trust
Client: Royal United Hospital Bath NHS Trust
Contractor: Bray and Slaughter
Architect: Royal United Hospital Bath NHS Trust
Value: Part of a £2.5 million project
Type of work: Supply and Installation of BioClad Walls and Welded Trims.

Wall finishes to Operating theatres and associated theatre rooms were required that could be quickly and easily installed onto an existing decorative wall that was required to provide an antimicrobial hygienic barrier.
With the Operating theatre closed, Advanced had to install 250m2 of Advanced PVC claddings. Each sheet was fully-bonded to plastered walls and held within a welded trim system. Corners were thermoformed on site to ensure a smooth joint-free radius that provides easy cleaning and prevents a build-up of dirt.
- Case Studies
- Fort Dunlop
- Croxteth Primary School, Liverpool
- King Hamad General Hospital, Muharraq - Bahrain
- Hameed Latif Hospital - Lahore, Pakistan
- Tests in Leicester show silver helps kill bacteria
- First Ever Trial at Heartlands Hospital
- Gateshead College of Further Education
- Loch Fyne Restaurant, Didsbury, Manchester
- Royal United Hospital Bath NHS Trust