Useful hints

For a free competitive quotation and advice please send us a rough plan via fax (01964 530700) or complete the request page listing room sizes with windows/doors/pillars (don't forget the ceiling height!) and we'll try to get an all inclusive price delivered the same day.
- Panel should be cut with a jigsaw.
- Any very high or low areas on walls should be flattened. In severe cases wooden or PVC laths may be fixed to the wall and 9mm plyboard fitted prior to cladding. A good quality mastic will also assist.
- Hot pipes must not be in direct contact with the cladding. If this is unavoidable pipes must be adequately insulated. Allow at least 3mm gap between pipes and electric fittings.
- Wet areas and sealing: areas regularly steam cleaned or very wet conditions should be thoroughly cleaned and sealed round all edges and openings (use EASYCLAD Silicone Sealant).
Advanced Hygienic Contracting Ltd, Hammerain House, Hookstone Avenue, Harrogate, N. Yorkshire, HG2 8ER